Quantcast
Jump to content


IMG_20160620_151021212_HDR.jpg



Here is a pic of the chassis on the Hisun Strike 250. As you can see, we really know this UTV! We know what works and what needs to be replaced. Please feel free to ask.


From the album:

strike250

· 18 images
  • 18 images
  • 0 comments
  • 28 image comments

Photo Information

  • Taken with Motorola XT1080
  • Focal Length 4.5 mm
  • Exposure Time 97/100000
  • f Aperture f/2.4
  • ISO Speed 160

Recommended Comments

Travis

Posted

i bet that was hard work getting it to that point!

strike250

Posted

It was surprisingly easy, I actually did it without the service manual as well. Learned a lot. Found a lot of loose nuts and bolts which I replaced with quality ones. Just wanted to know more about the construction of the unit overall, welds and connections. I found a lot of things I would have done different, like re-routing the wiring and harness in different areas from the factory, they seemed to just place things in there. I found much better routing, safer as well.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


×
×
  • Create New...