Quantcast
Jump to content


Recommended Posts

Posted

Is there any way to add a hydraulic lift bed kit to a CF Moto UTV? Other manufacturers like Kawasaki sell add on kits for the Mule to make the manual  dump bed a power dump bed. 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By lincolnsq175
      Ive searched and cannot find any performance parts that fit my machine.
      I have a 2020 coleman ut400.
      Im looking for machined sheave kit, programmers, cdi, exhaust and intake.
      I know these are yamaha rhino clones but are they rhino 450 clones?
       
      Any info is appreciated.
    • By didgeridoo
      Hello, All!  I've decided to replace the traction batteries in my 2018 Sector E1 with a 48V Lithium set. They may be expensive, but I figure the Discovery Dry Cell are, too. I am not looking for the max driving range, as I have never received near the brochured range to begin with, but a good mix of charge/ get work done/ charge is what I am expecting.
      I have settled on the 48V EAGL kit from bigbattery dot com. Each battery pack provides 30Ah. The kit ships with a charger, as well. The packs would be physically connected in parallel (using a busbar) to one another, maintaining the 48V voltage, but together would be able to provide the amp draw the buggy pulls when going up hill or towing a rake (rated 320 max continuous Amps). This is in comparison to the serial connection the eight 6V lead batteries. Each of the EAGL batteries looks to have its own BMS; am I correct in thinking I will have to use their included charger rather than (simply) changing the onboard charger to lithium mode? The chemistry of the pack is LiFe PO4, for what it's worth.  I haven't torn anything apart yet (to diagram), so  I am not sure how the dash will interpret the AMP draw, but the kit I am looking at includes a dash mounted charge indicator.
      If anyone has completed a similar conversion, do you have any tips? Specifically, how did you remove the original batteries, and how did you secure the new ones? I am guessing that almost any change from the stock batteries would involve at least some modifications. Any tips would be appreciated, especially things I may have failed to consider. Thanks!
    • By CYJSP2009
      Dear Friends, 
      2022 Brand new Joyner CV Axles and CV  Joint rebuild kits are comming 
      1.  S650.03.02.02.00 ---Joyner 650 Commando Rear
      2. TR1100.03.01.03.00 --- Joyner Trooper Front 
      3. TR1100.03.02.03.00 --- Joyner Trooper Rear
      4. D650.03.02.02.00 --- Joyner 650 Sand Spider Rear Left 
      5. D650.03.02.03.00--- Joyner 650 Sand Spider Rear Right 
      6. SV800.03.02.01.00 --- Joyner 800 Viper, SV1100 Drive shaft Left
      7.  14274 --- 650 ider rear left, rear right, 800 MV; 800Viper, SV1100 Drive shaft rear left and rear right outer cv joint rebuild kit
      8. 15803  ---  650 Sand Spider rear left, rear right, 800 MV; 800Viper, SV1100 Drive shaft rear left and rear right outer cv joint rebuild kit
      Attached are the part photos for reference. 
      Above parts are now on the way to USA, will be ready for inland delivery in middle of July. 
      Price: CV Axle: USD250/ Piece;  CV Joint kit (without grease): USD110  send to door. 
      There will be special discount availabe for deals completed within July 2022.  
      Buy 1 piece: Get 5% discount, 
      Buy 2 pieces: get 10% discount.
      Buy 3 pieces: get 15% discount, 
      Buy 4 and more than 4 pieces: get 20% discount. 
      Please kindly note Qty for each part is not big  and it is hard to forcast when there will be next offer for these kind of products unless there is sufficient confirmed order qty for productioin arrangement. 
      Payment method: Payoneer payment link ( can pay through bank account or credit card) or Paypal ( [email protected]) .  Payment commission paid by the buyer. 
      Interested parties, please contact [email protected]
      Thanks
      Good Luck
      Casey / Leaf Asia
      July-07-2022
       
       
       














    • By Jim Kessell
      Hi All
      Just installed a predator 670 on my Landmaster. My question is can I remove the low oil pressure wire fitting and plumb my mechanical gauge into that access point?
      Thanks in advance for your advice !!
      Jim
    • By Will D
      Hello, I have a mule 4010 trans that appeared to overheat based on the temperature light on the dash and it went into limp mode.  No steam though.  After letting it cool and the next day, I drove it around quite a bit and it did not have any problems.  Any ideas on this.  Do thermostats work intermittently?  I would like to fix the problem, looking for advice.  Many thanks 
×
×
  • Create New...